The Assembly Building At Clipper Mill

Cho Benn Holback + Associates

Shared By

Suren

Consultants

  • General Contractor: Tim Pula
  • Tim Pula

Project Status

Built

Size

62,794 sq. feet

Construction Cost

$7,849,250

Type

Other

Room or Space

Other
View all (8) images

Project Description

2008 RADA
Adaptive Reuse / Grand

So many urban loft conversions all but obliterate the building's sense of history. This one celebrates it as a ruin, rough edges and all. Built circa 1890, this part of the historic mill complex had been slowly disintegrating when a fire burned the roof off, leaving only a masonry-and-steel shell. In an effort that David Benn, AIA, likens to putting a ship in a bottle, the design team inserted a ground-level concrete plinth that houses office space. Above are two floors of two-level loft units that align with the existing double-height arched windows. Light filters into the commercial core through pyramid skylights cut into a second-story open-air courtyard. Lit at night, they glow upward like jewels.

The architects opened another three-story light well that exposes a basement-level stream. “We cut an opening into the stream, so theoretically you could be sending a fishing line down,” Benn explains, “but it looks more like the sewers of Paris, with a cobbled bottom.” To make living there even more fun, a hike-and-bike greenway also runs through the renovated building.

The jury applauded the firm for preserving a sense of the original shell. “These buildings are being demolished so fast, and to keep this is great,” said one judge.
Advertisement
Add A Project
Publish Your Projects Show off and upload images, text, and video of your work. We pick the very best for our project newsletters. Upload

Join the Discussion

Please read our Content Guidelines before posting

Close X