Project

Posted on:

Massport Garage

Arrowstreet

Shared By

TyllAST, Arrowstreet


Project Name

Massport Garage

Project Status

Built

Year Completed

2016

Client/Owner

Massachusetts Port Authority


Team

  • Geroge Tremblay
  • David Bois
  • Amy Korte


View all (3) images

Project Description

With the recent additions to airline gates and routes at Logan International Airport, Massport required improved parking for travelers in East Boston. Arrowstreet is currently leading a multidisciplinary team in preparing architectural, engineering and design studies for the construction of additional parking at the West Garage. The team is evaluating the seamless integration of new structures into existing garages, walkways, and adjacent terminals. Arrowstreet worked with the Authority early in the project to evaluate multiple options and develop a configuration that optimized parking and passenger experience. Special attention is being paid to garage exteriors through the use of kinetic facades to provide distinctive screening and an attractive backdrop to the 911 Memorial and the Hilton Hotel. The West Garage is being completed on an aggressive timeframe and using Lean Construction principles.
Advertisement
Add A Project
Publish Your Projects Show off and upload images, text, and video of your work. We pick the very best for our project newsletters. Upload

Join the Discussion

Please read our Content Guidelines before posting

Close X