An Accessible Design Bath on a Very Short Timeline

Glickman Design Build


1881 Nash St



Brand couple


  • Russell Glickman
  • Keith Long
  • Lanna Ali-Hassan

Project Status


Year Completed



200 sq. feet

Construction Cost


Room or Space



View all (5) images

Project Description

This award-winning bathroom remodel/renovation was truly unique. The client has ALS, a progressive Neurodegenerative disease, and therefore needed to convert a basically brand new 18th floor condominium bathroom into an accessible bathroom. Returning from Florida to the DC area in less than a month, the modifications had to be done extremely quickly.
The client was away for the duration of construction. They came back to a completely made over bathroom and couldn’t have been more thrilled. The renovation included relocating some existing items and installing others completely new. The items that were removed from the existing bathroom included: a platform and a tub, a shower seat and a niche, a shower glass enclosure, a marble shower and bath floor and walls, a framed partition, a stone countertop, a wall-hung glass mirror, a sliding door and a toilet. The existing medicine cabinet, vanity base cabinets, and sink were relocated within the room.

Read their story here -
Add A Project
Publish Your Projects Show off and upload images, text, and video of your work. We pick the very best for our project newsletters. Upload

Join the Discussion

Please read our Content Guidelines before posting

Close X